Comprehensive conversion metrics, plant utilities, CAPEX guide, and project economics for setting up Biodiesel, Bioethanol, and Compressed Biogas (CBG) installations.
Input project parameters to calculate technical outputs and utility requirements immediately.
MAHIJA designs and installs high-efficiency, multi-feedstock biodiesel production systems complying fully with BIS and ASTM specifications. The plants are capable of handling high FFA oils and feedstocks seamlessly.
| Particulars | 10 KLPD | 20 KLPD | 30 KLPD | 40 KLPD | 50 KLPD |
|---|---|---|---|---|---|
| Production Capacity | 10 KLPD | 20 KLPD | 30 KLPD | 40 KLPD | 50 KLPD |
| Feedstock | UCO, PFAD, Acid Oil, MFA, High FFA Oils (Up to 95% FFA with Esterification) | ||||
| Technology | Semi-Continuous PLC Based | ||||
| Land Requirement | 1 Acre | 1.5 Acre | 2 Acre | 2.5 Acre | 3 Acre |
| Built-Up Area | 12,000 Sq.ft | 18,000 Sq.ft | 25,000 Sq.ft | 32,000 Sq.ft | 40,000 Sq.ft |
| Connected Power Load | 100 KW | 100 KW | 100 KW | 250 KW | 300 KW |
| Boiler Requirement | 1 TPH | 2 TPH | 3 TPH | 4 TPH | 5 TPH |
| Water Requirement | 10 - 15 KLD | 20 - 25 KLD | 30 - 35 KLD | 40 - 45 KLD | 50 - 60 KLD |
| Manpower Requirement | 10 - 12 | 15 - 18 | 20 - 25 | 25 - 35 | 40 - 45 |
| Plant Operation | 24 Hours Operation | ||||
Capacity selection, feedstock assessment, financial viability studies, planning.
Process Flow Diagrams (PFD), P&ID development, utilities and equipment engineering.
Reactors, distillation systems, methanol recovery units, storage tanks.
Site supervision, installation support, trial runs, performance audits.
Operator training, SOP development, troubleshooting support, yield audits.
UCO procurement network, acid oil sourcing and multi-feedstock strategy.
Product standardization, lab setup guidance, BIS standard compliance.
Buyer network access, sales strategy, export market guidance.
| Capacity | Estimated Investment (CAPEX)* | Typical Payback Period* |
|---|---|---|
| 10 KLPD | ₹ 5 Crore Onwards | 3 - 4 Years |
| 20 KLPD | ₹ 9 Crore Onwards | 3 - 4 Years |
| 30 KLPD | ₹ 13 Crore Onwards | 2.5 - 4 Years |
| 40 KLPD | ₹ 17 Crore Onwards | 2.5 - 3.5 Years |
| 50 KLPD | ₹ 21 Crore Onwards | 2.5 - 3.5 Years |
*Note: CAPEX calculations relate to the basic semi-continuous plant. Land, statutory approvals, working capital, and optional automation features are excluded. Payback calculations are subject to raw material feedstock cost and plant operating efficiency.
Multi-feedstock grain-based bioethanol plants support broken rice, corn (maize), jowar, sweet sorghum, and damaged food grains to yield 99.8% fuel-grade anhydrous ethanol, aligned with India's National Biofuel Policy.
| Plant Capacity | Corn / Jowar Feedstock (60% Starch) | Broken Rice Feedstock (72% Starch) | ||
|---|---|---|---|---|
| Ethanol Output | Grain Feed (MT/Day) | Ethanol Output | Rice Feed (MT/Day) | |
| 10 KLPD | 10,000 L/Day | 26.5 MT | 10,000 L/Day | 23 MT |
| 20 KLPD | 20,000 L/Day | 53.0 MT | 20,000 L/Day | 47 MT |
| 30 KLPD | 30,000 L/Day | 80.0 MT | 30,000 L/Day | 70 MT |
| 40 KLPD | 40,000 L/Day | 106.0 MT | 40,000 L/Day | 94 MT |
| 50 KLPD | 50,000 L/Day | 132.0 MT | 50,000 L/Day | 117 MT |
| Capacity | Investment CAPEX | Land Required | Power Connected | Steam Boiler | Water (KLD) | Manpower | Typical Payback |
|---|---|---|---|---|---|---|---|
| 10 KLPD | ₹ 12 - 15 Cr | 2 - 3 Acres | 400 KW | 6 TPH | 120 - 150 | 20 - 25 | 4 - 6 Years |
| 20 KLPD | ₹ 20 - 25 Cr | 3 - 4 Acres | 650 KW | 10 TPH | 250 - 300 | 30 - 35 | 4 - 6 Years |
| 30 KLPD | ₹ 30 - 35 Cr | 4 - 5 Acres | 900 KW | 15 TPH | 350 - 450 | 40 - 50 | 3.5 - 5 Years |
| 40 KLPD | ₹ 40 - 50 Cr | 5 - 6 Acres | 1,200 KW | 20 TPH | 500 - 600 | 55 - 65 | 3 - 5 Years |
| 50 KLPD | ₹ 50 - 65 Cr | 6 - 8 Acres | 1,500 KW | 25 TPH | 650 - 800 | 70 - 80 | 3 - 4.5 Years |
High-protein animal feed by-product that commands a strong premium in local dairy and poultry industries.
Recovered fermentation gases purified to food-grade standards for beverage and industrial markets.
Turnkey CBG plants employ anaerobic digestion to process Napier grass, cattle manure, press mud, and food waste into vehicle-grade renewable Bio-CNG, producing organic solid/liquid fertilizer by-products.
| CBG Capacity | Napier Grass Feed | Cattle dung Feed | Biogas Generated | CBG Output (kg/Day) | Land Requirement | Project CAPEX | Power connected | Typical Payback |
|---|---|---|---|---|---|---|---|---|
| 1 TPD | 25 MT/Day | 3 MT/Day | 2,600 - 2,900 m³ | 950 - 1,100 | 1 Acre | ₹ 4 - 5 Cr | 80 - 100 KW | 2 - 3 Years |
| 3 TPD | 75 MT/Day | 10 MT/Day | 7,875 - 8,625 m³ | 2,900 - 3,200 | 2 - 3 Acres | ₹ 11 - 12 Cr | 246 KW | |
| 5 TPD | 125 MT/Day | 18 MT/Day | 13,000 - 14,000 m³ | 4,800 - 5,300 | 4 - 5 Acres | ₹ 17 - 19 Cr | 425 - 450 KW | |
| 6 TPD | 150 MT/Day | 25 MT/Day | 15,750 - 17,250 m³ | 5,800 - 6,400 | 5 - 6 Acres | ₹ 21 - 22 Cr | 532 KW |
| CBG Capacity | FOM Solid (TPD) | LFOM Liquid (KLPD) |
|---|---|---|
| 1 TPD | 5 - 7 TPD | 15 - 20 KLPD |
| 3 TPD | 15 - 20 TPD | 45 - 50 KLPD |
| 5 TPD | 25 - 28 TPD | 75 - 80 KLPD |
| 6 TPD | 30 TPD | 90 - 95 KLPD |
Anaerobic digestion produces premium organic bio-fertilizers. These residues are packed with plant nutrients and trace minerals, serving as a significant source of additional revenue for the project.